Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts

24 February 2009

Noble Five

Some construction action at the cafe circa December...

Caleb stickers bags in the cold garage back in December.

Another early construction picture, taken before the roasting room was finished.

17 February 2009

Noble Four

Jared Rennie records roasting details, entering data on the myriads of variables associated with coffee roasting.

Open soon... but when!?


A roaster can check the progress of the roast by removing small samples and checking bean color. To be honest, I believe there's more to it than that, but I'll have to ask next time I'm taking pictures. :)

08 February 2009

Noble Three

Jared and Caleb survey the work to be done in December.


Garage roasting no more... the Probat has since moved to the cafe location in Ashland.